ZLD water recovery and brine balance calculator
Screen how staged water recovery changes brine volume and dissolved-solids concentration in a proposed zero-liquid-discharge (ZLD) train. Enter a feed flow and total dissolved solids (TDS), then assign water-recovery assumptions to each selected stage.
Concept preview: the controls below illustrate a proposed interface; they are not connected to a calculation model. A working version would require engineering validation before use.
1. Define the feed
Average operating flow for the selected basis.
Use a representative analysis; TDS alone does not describe salt chemistry.
2. Choose the process train
Set an assumed water recovery for each stage. Disable stages that are not part of the proposed train.
| Stage | Include | Water recovery (%) | Product stream |
|---|---|---|---|
| Membrane pre-concentration (for example, RO) | Permeate | ||
| Evaporation / brine concentrator | Condensate | ||
| Crystallizer or final solids step | Condensate and solids |
Preview only: “Calculate” is shown as a future control. Values remain blank because this concept has no calculation logic yet.
3. Review the mass-balance results
| Result | Illustrative output | What it means |
|---|---|---|
| Water recovered by stage | — | Permeate and condensate flows, shown separately. |
| Final liquid flow and estimated TDS | — | Remaining liquid after the selected recovery stages. |
| Overall water recovery | — | Total recovered water divided by feed flow. |
| Residual dissolved-solids load | — | Indicative salt mass in the final liquid, subject to the model assumptions. |
ZLD boundary check
A high recovery percentage alone does not establish ZLD. The user would identify the process boundary and account for every liquid outlet, including purges, cleaning wastes and residual brine. The screening result should say “liquid discharge remains” if any liquid leaves that boundary, and “no liquid discharge indicated” only when the balance and all residual streams support that conclusion.
Calculation basis and limitations
A first version could use a transparent water-and-dissolved-solids balance. It would report the assumptions, units and equations beside the results. A TDS-only balance cannot predict which minerals precipitate, scaling rates, solids purity or disposal classification. Those require full ion analyses, temperature and pH conditions, validated chemistry and process-specific design.
The first version should not estimate energy use, operating cost or guarantee equipment performance. These depend on feed composition, heat integration, equipment selection, operating conditions and site-specific costs.
Related Lenntech information
- Evaporation for brine concentration
- Crystallization for brine treatment
- Resource recovery from brine
- RO Recovery & Scaling Potential Calculator
For preliminary screening only. Confirm the process boundary, water analysis and residuals route with a qualified process engineer before using results in design or permitting.