Rapid separation of sand from water
Waste water recycling for the brick work and ceramic industry for soft mud installations.
Lenntech is a supplier of water treatment plants. The company promotes the Wet Cross-flow System units (WCS-units) on an and international scale. The system treats process water from ceramic plants in such a way that it can be reused in the ceramic production process. | |
| | Nine years ago the development of the Wet Cross-flow System was started on request of Machinefabriek De Boer. This company requested a reliable system for cleaning process and wastewater from the ceramic industry in order the reuse the water. WET had gained a lot of experience in the field of cleaning process water in the potato starch industry, the cleaning of water containing sand and clay showed to be more difficult. It was the start of a lengthy learning process, which was due to the many different sands and clays used in the ceramic industry. Nowadays the WCS-unit is well appreciated and accepted by the ceramic industry as well in The Netherlands as worldwide. Installations are in successful operation at Boral Bricks in the United States, Facade Beek, The Netherlands, Baggeridge in the United Kingdom and IBL in Italy. |
The filtration processIn average the brick industry uses 60 m3/hour of process water. The main use of this water is for cleaning the moulds of the mould chain. The capacity of the required installation is calculated in close co-operation with the experts of the supplier of the press. The capacity depends on the number of moulds in the chain of the press. |
|
Mr. P.F.H. Collard, managing director of Facade Beek bv, The Netherlands stated: | A compact unit, rapid erection and little maintenance Strict environmental rules come in force in case of renovation and or changes in the existing production. In that case investment in a water treatment plant is good decision, which has a favourable pay back time. The compact WCS-unit (necessary surface area 2.5 x 3.85 m) absorbs little space and is easily transported all over the world and can be installed in a short time. The project manager from WET stays in close contact with the client in the period between the initial contact and the installation of the unit in the plant. In order train the operators and make sure that the unit is functioning well. The construction of the WCS-unit by the client ensures a fast supply. |